Xiamen Qiyue Transit Storage and Transportation Project
The transfer storage and transportation project of Xiamen Qiyue Industrial Co., Ltd., undertaken by Hangzhou Yuntian, uses two 500TPH track mobile screw unloaders (suitable for barges below 50000 tons) for unloading operations at the dock. Due to site conditions, the subsequent transportation system uses a combination of pit belt conveyors and elevated belt conveyors to transport materials to the factory area. There is a fly ash air separation system installed in the factory area, which sorts the raw fly ash and transports it to a silo for storage. This project involves the construction of six 15000 ton silos equipped with unmanned loading systems.